Indra’s Non-Introductory Maryland Variable Rate

Indra Energy’s non-introductory natural gas and electricity variable rates for each utility are listed below. Rates are estimated and subject to change each month. The estimated rate for your next billing period will be made available to you at least 12 days prior to the close of your current billing period.  INDRA will not charge a rate that exceeds the estimated rate listed below.

NATURAL GAS – July 2020
UtilityIndra's Variable Rate / Therms
BGE$1.55780
Washington Gas$1.78070
ELECTRICITY – July 2020
UtilityIndra's Variable Rate / kWh
BGE$0.19178
DPEMD$0.20453
PEPCO$0.19326
POTOMAC EDISON$0.18845
NATURAL GAS – August 2020
UtilityIndra's Variable Rate / Therms
BGE $1.57870
Washington Gas $1.79910
ELECTRICITY – August 2020
UtilityIndra's Variable Rate / kWh
BGE $0.19382
DPEMD $0.19890
PEPCO $0.19304
POTOMAC EDISON $0.19011