INDRA’s Non-Introductory Maryland Variable Rate

INDRA Energy’s non-introductory natural gas and electricity variable rates for each utility are listed below. Rates are estimated and subject to change each month. The estimated rate for your next billing period will be made available to you at least 12 days prior to the close of your current billing period.  INDRA will not charge a rate that exceeds the estimated rate listed below.

NATURAL GAS – August 2019
UtilityINDRA's Variable Rate / Therms
BGE $ 1.6262
Washington Gas $ 1.7018
ELECTRICITY – August 2019
UtilityINDRA's Variable Rate / kWh
POTOMAC EDISON$ 0.19916
BGE $ 0.19876
DPEMD $ 0.20173
PEPCO $ 0.20372
NATURAL GAS – August 2019
UtilityINDRA's Variable Rate / Therms
BGE $ 1.6262
Washington Gas $ 1.7018
ELECTRICITY – September 2019
UtilityINDRA's Variable Rate / kWh
POTOMAC EDISON $0.20097
BGE $0.19581
DPEMD $0.20031
PEPCO $0.20144