INDRA’s Non-Introductory Maryland Variable Rate

INDRA Energy’s non-introductory natural gas and electricity variable rates for each utility are listed below. Rates are estimated and subject to change each month. The estimated rate for your next billing period will be made available to you at least 12 days prior to the close of your current billing period.  INDRA will not charge a rate that exceeds the estimated rate listed below.

NATURAL GAS – October 2019
UtilityINDRA's Variable Rate / Therms
BGE $ 1.6161
Washington Gas $ 1.7606
ELECTRICITY – October 2019
UtilityINDRA's Variable Rate / kWh
BGE $ 0.2031
DPEMD $ 0.2070
PEPCO $ 0.2097
POTOMAC EDISON$ 0.2073
NATURAL GAS – November 2019
UtilityINDRA's Variable Rate / Therms
BGE $ 1.6304
Washington Gas $ 1.6756
ELECTRICITY – November 2019
UtilityINDRA's Variable Rate / kWh
BGE $0.2033
DPEMD $0.2031
PEPCO $0.2048
POTOMAC EDISON $0.1988