INDRA’s Non-Introductory Maryland Variable Rate
INDRA Energy’s non-introductory natural gas and electricity variable rates for each utility are listed below. Rates are estimated and subject to change each month. The estimated rate for your next billing period will be made available to you at least 12 days prior to the close of your current billing period. INDRA will not charge a rate that exceeds the estimated rate listed below.
NATURAL GAS – February 2019
Utility | INDRA's Variable Rate / Therms |
---|---|
BGE | $ 1.9934 |
Washington Gas | $ 1.9614 |
ELECTRICITY – February 2019
Utility | INDRA's Variable Rate / kWh |
---|---|
POTOMAC EDISON | $ 0.25068 |
BGE | $ 0.26530 |
DPEMD | $ 0.26835 |
PEPCO | $ 0.27041 |
NATURAL GAS – March 2019
Utility | INDRA's Variable Rate / Therms |
---|---|
BGE | $ 1.77590 |
Washington Gas | $ 1.72220 |
ELECTRICITY – March 2019
Utility | INDRA's Variable Rate / kWh |
---|---|
POTOMAC EDISON | $0.20398 |
BGE | $0.21061 |
DPEMD | $0.21062 |
PEPCO | $0.21593 |