INDRA’s Non-Introductory Maryland Variable Rate

INDRA Energy’s non-introductory natural gas and electricity variable rates for each utility are listed below. Rates are estimated and subject to change each month. The estimated rate for your next billing period will be made available to you at least 12 days prior to the close of your current billing period.  INDRA will not charge a rate that exceeds the estimated rate listed below.

NATURAL GAS – April 2019
UtilityINDRA's Variable Rate / Therms
BGE $ 1.71700
Washington Gas $ 1.71570
ELECTRICITY – April 2019
UtilityINDRA's Variable Rate / kWh
POTOMAC EDISON$ 0.19741
BGE $ 0.19900
DPEMD $ 0.19291
PEPCO $ 0.19434
NATURAL GAS – May 2019
UtilityINDRA's Variable Rate / Therms
BGE $ 1.70560
Washington Gas $ 1.74740
ELECTRICITY – May 2019
UtilityINDRA's Variable Rate / kWh
POTOMAC EDISON $0.19873
BGE $0.19459
DPEMD $0.19833
PEPCO $0.19860