INDRA’s Non-Introductory Maryland Variable Rate

INDRA Energy’s non-introductory natural gas and electricity variable rates for each utility are listed below. Rates are estimated and subject to change each month. The estimated rate for your next billing period will be made available to you at least 12 days prior to the close of your current billing period.  INDRA will not charge a rate that exceeds the estimated rate listed below.

NATURAL GAS – May 2020
UtilityINDRA's Variable Rate / Therms
BGE $1.55340
Washington Gas $1.79500
ELECTRICITY – May 2020
UtilityINDRA's Variable Rate / kWh
BGE $0.19303
DPEMD$0.19743
PEPCO$0.19584
POTOMAC EDISON$0.19368
NATURAL GAS – June 2020
UtilityINDRA's Variable Rate / Therms
BGE$1.55020
Washington Gas$1.76450
ELECTRICITY – June 2020
UtilityINDRA's Variable Rate / kWh
BGE$0.18787

DPEMD$0.19820
PEPCO$0.18910
POTOMAC EDISON$0.18531